Howard Humphreys (East Africa) Limited

OLKARIA IV AND OLKARIA I ADDITIONAL UNITS 4 & 5 GEOTHERMAL POWER PROJECT
Project Details
Client Scope Services Timeline
Kenya Electricity Generating Company Limited (KENGEN)
The Client appointed Sinclair Knight Merz (SKM) in association with Atkins (The Sub Consultant) to prepare conceptual design, detailed design of steam field civil works, prequalification documents, bid documents, undertake bid evaluation, contract negotiation and award, construction and commissioning and defects liability period for a 280 MW geothermal power project. The project comprises Steam Field Development, 2 No. 140 MW Power Plants, Sub Stations and Power Transmission Lines.
Services Provided: Preparing conceptual designs, prequalification documents, bid documents, undertaking bid evaluation, contract negotiations and award, construction and commissioning and defects liability period Preparation of detailed designs and drawings for civil / structural works for Steam Field. Supervision of civil/building construction works Site-based Safety management.
Year